Sun Safe LLC

Plug-In Solar in Maryland

The law, and what it means for your design.

Plug-in solar by state › Maryland

In effect

Law checked Oct 13, 2026 against HB 1532 (Chapter 353), § 7-321 · Last change: rows matched to the statute: feed-back fee wording, net metering, credits and liability · Change log

Maryland’s plug-in rules came in a larger energy affordability law and is in effect. The key design facts are one device per meter, residential use only, and a notice to the utility before you install.

What you can build today

Up to 391 W: inspector’s call. The law waives listing rules that would require rewiring (§ 7-321(F)), but not your county’s electrical code.

Over 391 W: no plug-in path yet. The listing’s conditions apply in full, and its parts aren’t on sale.

Always an option: a permitted, hardwired system under NEC 690 and 705 with your utility’s approval, or an off-grid power station that never connects to house wiring. UL Solutions notes the 2026 NEC “does not recognize the use of plug-in photovoltaic (PIPV) modules”; NFPA expects them in the 2029 edition (source). Where a law requires the NEC and gives no size waiver, the inspector decides. Sun Safe’s reading, not legal advice.

Limit
1,200 W, one device per meter
Law
HB 1532 (Utility RELIEF Act)
Signed
May 12, 2026
Effective
In effect (July 1, 2026 per the fiscal note; the bill page lists it as an emergency bill)
Electrical code
No single statewide edition: your county or city sets it, so ask your local inspector

What the law says

Size limit1,200 W maximum output back to the building’s electric system (§ 7-321(A)(3))
How it’s measuredOne system per electric meter, residential use only (§ 7-321(B)).
DefinitionMovable, connects through a standard electrical outlet, and meant mainly to offset part of the building’s use (§ 7-321(A)).
Small-device breakDevices of 391 W or less to the outlet are exempt from product-listing provisions that would require alterations to the building’s premises, wiring or electrical panels (§ 7-321(F)).
ListingCertified by UL or an equivalent nationally recognized testing lab.
Utility noticeBefore installing, with a certification of the device’s safety features and maximum generating capacity (§ 7-321(E)).
Utility approval and feesNo approval, no fee for the system’s ability to feed power back, and no extra controls or equipment, except that you pay for an automatic locking disconnect switch if the system requires one (§ 7-321(D)-(E)).
Utility liabilityThe utility isn’t liable for damage from the device (§ 7-321(D)(2)).
Power sent to the gridNot subject to the net metering sections (§§ 7-306, 7-306.1); no renewable portfolio credit and no renewable energy credits of any type (§ 7-321(C)). The Public Service Commission warns exported power may be counted as zero or added to your usage, depending on the meter.
Renters and HOAsNot addressed in § 7-321.

Effective date: the fiscal note says July 1, 2026; the bill page lists HB 1532 as an emergency bill, effective on enactment (May 12, 2026). Either way it is in effect.

In the law’s words

Short excerpts from HB 1532 (Chapter 353), Public Utilities § 7-321, quoted as written and checked word for word against the official text on October 13, 2026; each with what it means for a plug-in design.

10 excerpts with what each means

What it means for your design

Designs that fit, and one that doesn’t

FitsOne APsystems EZ1-LV (900 VA) with two panels, after notifying the utility.
Doesn’t fitTwo inverters on one meter, even if the total is under 1,200 W.

The engineering behind it

Why the circuit matters as much as the law, in four short points.

Circuit current, continuous output, outdoor outlets, AC vs panel watts

Why the circuit matters. A plug-in inverter pushes current into a branch circuit from the outlet end. The breaker in your panel only sees the current coming from the panel, not what the inverter adds. With other loads on the same circuit, part of the wire can carry the breaker’s full rating plus the inverter’s output without anything tripping. At 1,200 W the inverter adds 10 A at 120 V. That’s why we recommend a dedicated circuit for any plug-in system, even where the law doesn’t require one.

Continuous output. Code treats inverter output as continuous and sizes the circuit at 125% of it (NEC 705.28): 1,200 W is 10 A, times 1.25 is 12.5 A, which fits a 15 A circuit. Anything over 1,440 W needs a 20 A circuit.

Outdoors. Outdoor receptacles need GFCI protection (NEC 210.8) and an in-use weatherproof cover (NEC 406.9).

AC, not panel watts. These laws limit what the inverter puts out, not what the panels are rated for. You can put more panel on a small inverter; it trims the brightest hours and fills out the rest of the day. The Designer models that trimming hour by hour.

Design your systemSee Maryland on the map

Questions

Is plug-in solar legal in Maryland?

Yes. The plug-in provisions of HB 1532 (Chapter 353) took effect July 1, 2026, according to the General Assembly’s Department of Legislative Services.

How many plug-in solar devices can I have in Maryland?

One per electric meter, for residential use, up to 1,200 W.

Do I have to tell the utility in Maryland?

Yes, before installing, with a certification of the device’s safety features and capacity.

Sources

Bill text read September 29, 2026; law checked October 13, 2026 by Casey Schuyler, NABCEP PV Associate and O&M Associate Technician, Sun Safe LLC. Information for planning, not legal advice. Laws change; verify against the bill and your local authority having jurisdiction. Sun Safe’s position: installations should be code-compliant, and a practicing electrician is recommended.