Plug-In Solar in New Hampshire

The law, and what it means for your design.

Plug-in solar by state › New Hampshire

Signed, takes effect January 1, 2027

Law checked Oct 13, 2026 against SB 540-FN final version (Chapter 262) · Last change: effective date corrected to January 1, 2027; connection, listing, fee and net-metering rows rewritten to the final text · Change log

New Hampshire’s law was signed July 2, 2026 and takes effect January 1, 2027. A building-code section waits on a Department of Energy certification. It’s written around the inverter’s AC output and one system per metered customer.

What you can build today

Not in effect until January 1, 2027. Then: lab certification to plug-in safety standards, with building-code rules still pending a Department of Energy certification.

Always an option: a permitted, hardwired system under NEC 690 and 705 with your utility’s approval, or an off-grid power station that never connects to house wiring. UL Solutions notes the 2026 NEC “does not recognize the use of plug-in photovoltaic (PIPV) modules”; NFPA expects them in the 2029 edition (source). Where a law requires the NEC and gives no size waiver, the inspector decides. Sun Safe’s reading, not legal advice.

Limit
1,200 W AC inverter output, one per metered customer
Law
SB 540-FN
Signed
July 2, 2026
Effective
January 1, 2027 (building-code section after a DOE certification)

What the law says

Size limit1,200 W AC inverter output
How it’s measuredOne system per metered customer.
ConnectionThrough a receptacle or other non-permanent wiring connection (RSA 362-A:1-a, IV-a).
PurposeIntended to offset part of the customer’s own on-site use.
ListingCertified by a nationally recognized testing lab to national safety standards for distributed energy resources and plug-in systems (RSA 362-A:10, I). Building-code rules follow once the DOE certification is made.
Utility approval and feesNo interconnection review or agreement, no approval and no extra equipment. No fee related to the system, except charges it incurs through its use (RSA 362-A:10, III). The utility may set up an informational notice of the device’s wattage.
Power sent to the gridNot addressed by the law. The Department of Energy will publish consumer information, including on meters, billing and insurance.
Utility liabilityThe utility isn’t liable for damage from the device (Sec. 4).
Renters and HOAsNot addressed.

In the law’s words

Short excerpts from SB 540-FN, Chapter 262, final version, quoted as written and checked word for word against the official text on October 13, 2026; each with what it means for a plug-in design.

9 excerpts with what each means

What it means for your design

Designs that fit, and one that doesn’t

FitsOne APsystems EZ1-LV (900 VA) on an outdoor GFCI receptacle.
Doesn’t fitTwo separate plug-in systems on one metered account.

The engineering behind it

Why the circuit matters as much as the law, in four short points.

Circuit current, continuous output, outdoor outlets, AC vs panel watts

Why the circuit matters. A plug-in inverter pushes current into a branch circuit from the outlet end. The breaker in your panel only sees the current coming from the panel, not what the inverter adds. With other loads on the same circuit, part of the wire can carry the breaker’s full rating plus the inverter’s output without anything tripping. At 1,200 W the inverter adds 10 A at 120 V. That’s why we recommend a dedicated circuit for any plug-in system, even where the law doesn’t require one.

Continuous output. Code treats inverter output as continuous and sizes the circuit at 125% of it (NEC 705.28): 1,200 W is 10 A, times 1.25 is 12.5 A, which fits a 15 A circuit. Anything over 1,440 W needs a 20 A circuit.

Outdoors. Outdoor receptacles need GFCI protection (NEC 210.8) and an in-use weatherproof cover (NEC 406.9).

AC, not panel watts. These laws limit what the inverter puts out, not what the panels are rated for. You can put more panel on a small inverter; it trims the brightest hours and fills out the rest of the day. The Designer models that trimming hour by hour.

Design your systemSee New Hampshire on the map

Questions

Is plug-in solar legal in New Hampshire?

From January 1, 2027. SB 540 (Chapter 262) was signed July 2, 2026; the final text sets January 1, 2027 for the rest of the act (Sec. 7).

How big can plug-in solar be in New Hampshire?

1,200 W of AC inverter output, one system per metered customer.

Sources

Bill text read September 29, 2026; law checked October 13, 2026 by Casey Schuyler, NABCEP PV Associate and O&M Associate Technician, Sun Safe LLC. Information for planning, not legal advice. Laws change; verify against the bill and your local authority having jurisdiction. Sun Safe’s position: installations should be code-compliant, and a practicing electrician is recommended.