Sun Safe LLC

Plug-In Solar in New Jersey

The law, and what it means for your design.

Plug-in solar by state › New Jersey

Signed, takes effect March 1, 2027

Law checked Oct 13, 2026 against S 2368, third reprint (as passed; signed September 1, 2026) · Last change: rows rewritten to the bill text: interconnection exception, tenant scope and 14-day notice, permit wording, liability · Change log

New Jersey’s law takes effect six months after signing, on March 1, 2027. It requires UL 3700 (or a comparable standard), gives renters and HOA members strong protection, and bars towns from requiring a permit to place or use one.

What you can build today

Today: not in effect. The utility’s interconnection rules apply until March 1, 2027.

From March 1, 2027, up to 400 W: yes. A UL 3700-listed device on a standard outlet; the law waives listing, NEC and code rules that would require rewiring (§ 2(e)).

Over 400 W: no plug-in path yet. The listing’s conditions apply in full, and its parts aren’t on sale.

Always an option: a permitted, hardwired system under NEC 690 and 705 with your utility’s approval, or an off-grid power station that never connects to house wiring. UL Solutions notes the 2026 NEC “does not recognize the use of plug-in photovoltaic (PIPV) modules”; NFPA expects them in the 2029 edition (source). Where a law requires the NEC and gives no size waiver, the inspector decides. Sun Safe’s reading, not legal advice.

Limit
1,200 W combined per address (per unit in apartments)
Law
S 2368 / A 4836
Signed
September 1, 2026
Effective
March 1, 2027

What the law says

Size limit1,200 W combined per service address, unless an interconnection agreement is obtained first (§ 2(f))
How it’s measuredCombined for all devices at one service address, or per dwelling unit in multi-family housing.
ConnectionA standard 120 V AC outlet, on the customer’s side of the meter. Moveable, and meant mainly to offset the home’s own use.
ListingListed or certified to UL 3700, a comparable standard, or a combination of standards covering plug-in safety and grid-parallel operation, by an NRTL. Installed to the product listing, the NEC and the State Uniform Construction Code; the 2029 NEC’s plug-in rules apply once adopted (§ 2(a), 2(e)).
Outage protectionRequired: must not export during an outage.
Small-device breakDevices of 400 W or less to the outlet still need the listing, but are exempt from listing, NEC or code provisions that would require alterations to the building’s premises, wiring or electrical panels (§ 2(e)).
Utility approval and feesNo prior approval, no fee related to the device, no extra controls or equipment. Exempt from interconnection agreements and net metering program requirements (§ 2(b)-(c)).
Utility liabilityNot liable for damage or injury from a device, or for overvoltage or power-quality issues it causes (§ 2(d)).
RentersCovers tenants who pay for their own electricity. A landlord can’t prohibit a device within your leased premises, including a leased balcony or patio, but can set reasonable rules on size and placement and restrict it elsewhere on the property. Give written notice with documentation and the location 14 days ahead. You’re responsible for damage, and may be asked to indemnify for negligent installation or use (§ 3).
HOAsCan’t enforce a ban on the exterior of your unit; can set reasonable rules on size, placement and manner of placement (§ 3(e)).
TownsCan’t prohibit use on a residential property or require a permit, application, fee or license to place or use one. Building changes and electrical work still follow the NEC, the State Uniform Construction Code and local permit rules (§ 4).

In the law’s words

Short excerpts from S 2368, third reprint (signed September 1, 2026), quoted as written and checked word for word against the official text on October 13, 2026; each with what it means for a plug-in design.

13 excerpts with what each means

What it means for your design

Designs that fit, and one that doesn’t

FitsOne UL 3700-listed system with an EZ1-LV-class 900 VA inverter, installed the way its certificate describes: the circuit, outlet and GFCI it was tested with.
Doesn’t fitTwo 900 VA inverters at one address without an interconnection agreement (design guidance: we count VA as W).

The engineering behind it

Why the circuit matters as much as the law, in four short points.

Circuit current, continuous output, outdoor outlets, AC vs panel watts

Why the circuit matters. A plug-in inverter pushes current into a branch circuit from the outlet end. The breaker in your panel only sees the current coming from the panel, not what the inverter adds. With other loads on the same circuit, part of the wire can carry the breaker’s full rating plus the inverter’s output without anything tripping. At 1,200 W the inverter adds 10 A at 120 V. That’s why we recommend a dedicated circuit for any plug-in system, even where the law doesn’t require one.

Continuous output. Code treats inverter output as continuous and sizes the circuit at 125% of it (NEC 705.28): 1,200 W is 10 A, times 1.25 is 12.5 A, which fits a 15 A circuit. Anything over 1,440 W needs a 20 A circuit.

Outdoors. Outdoor receptacles need GFCI protection (NEC 210.8) and an in-use weatherproof cover (NEC 406.9).

AC, not panel watts. These laws limit what the inverter puts out, not what the panels are rated for. You can put more panel on a small inverter; it trims the brightest hours and fills out the rest of the day. The Designer models that trimming hour by hour.

Design your systemSee New Jersey on the map

Questions

When is plug-in solar legal in New Jersey?

March 1, 2027, six months after Governor Sherrill signed the Garden State Balcony Solar Act on September 1, 2026.

Can my landlord or HOA ban balcony solar in New Jersey?

A landlord can’t prohibit it within your leased premises if you pay for your own electricity; an HOA can’t enforce a ban on your unit’s exterior. Both can set reasonable rules on size and placement.

Do I need a permit for plug-in solar in New Jersey?

Not to place or use the device. Any electrical work or building change still follows the usual code and permit rules.

Sources

Bill text read September 29, 2026; law checked October 13, 2026 by Casey Schuyler, NABCEP PV Associate and O&M Associate Technician, Sun Safe LLC. Information for planning, not legal advice. Laws change; verify against the bill and your local authority having jurisdiction. Sun Safe’s position: installations should be code-compliant, and a practicing electrician is recommended.