Signed, takes effect January 1, 2027

Law checked Oct 13, 2026 against Code of Virginia §§ 56-596.8, 55.1-1212.1, 15.2-2288.7 · Last change: locking disconnect, 15-day review, renter scope, ratio billing and liability · Change log

Virginia’s law takes effect January 1, 2027. Like Maryland, it makes you notify the utility before you install, and it has detailed rules for renters that depend on how many units your landlord owns.

What you can build today

Today: not in effect. From January 1, 2027.

From 2027, up to 391 W: inspector’s call. The device must meet the NEC; the 391 W waiver covers listing rules only.

Over 391 W: no plug-in path yet. The listing’s conditions apply in full, and its parts aren’t on sale.

Always an option: a permitted, hardwired system under NEC 690 and 705 with your utility’s approval, or an off-grid power station that never connects to house wiring. UL Solutions notes the 2026 NEC “does not recognize the use of plug-in photovoltaic (PIPV) modules”; NFPA expects them in the 2029 edition (source). Where a law requires the NEC and gives no size waiver, the inspector decides. Sun Safe’s reading, not legal advice.

Limit
1,200 W per customer (per unit in apartments)
Law
HB 395 (Chapter 1052) and SB 250 (Chapter 998)
Signed
April 22, 2026
Effective
January 1, 2027

What the law says

Size limit1,200 W maximum power output
How it’s measuredPer customer, or per residential unit in multi-family housing.
Small-device breakDevices of 391 W or less to the outlet are exempt from product-listing provisions that would require changes to the building’s wiring or panel.
ListingCertified by an NRTL and meeting the current NEC.
Outage protectionRequired.
Utility noticeBefore installing, on the State Corporation Commission’s form, online or by mail. The utility has 15 days to flag problems with the form; no reply means you may install (§ 56-596.8(B)).
Utility approval and feesNo utility approval or fee. The utility may install a locking disconnect if you have more than one device or the circuit needs it (§ 56-596.8(C)). Exempt from interconnection and net metering.
RentersApplies to landlords owning more than four rental units, or more than a 10% interest in more than four. They can’t prohibit an install on the exterior of your unit but can set reasonable size, placement and manner rules, and restrict it elsewhere on the property. Give written notice at least seven days ahead, with documentation and the location. Wiring or panel changes need the landlord’s written approval. You’re responsible for any damage (§ 55.1-1212.1). Tenants on ratio utility billing aren’t covered by the utility exemptions and, under § 55.1-1212.1(E), may not install one (at most, only with the landlord’s written approval) (§ 56-596.8(F)).
Utility liabilityThe utility isn’t liable for damage, injury or service interruption from the device (§ 56-596.8(E)).
HOAs and townsHOA covenants still apply. Localities can’t prohibit these devices on homes, within height, setback and historic-district rules.

In the law’s words

Short excerpts from Code of Virginia §§ 56-596.8, 55.1-1212.1, 15.2-2288.7 (2026 Acts cc. 998, 1052; effective January 1, 2027), quoted as written and checked word for word against the official text on October 13, 2026; each with what it means for a plug-in design.

14 excerpts with what each means

What it means for your design

Designs that fit, and one that doesn’t

FitsAn APsystems EZ1-LV (900 VA) on an outdoor GFCI outlet, after filing the SCC notice and waiting 15 days.
Fits, with the small-device breakA single panel on a Hoymiles HiFlow Pro 391 LV in an older home where panel changes aren’t practical.
Doesn’t fitPlugging in before notifying the utility.

The engineering behind it

Why the circuit matters as much as the law, in four short points.

Circuit current, continuous output, outdoor outlets, AC vs panel watts

Why the circuit matters. A plug-in inverter pushes current into a branch circuit from the outlet end. The breaker in your panel only sees the current coming from the panel, not what the inverter adds. With other loads on the same circuit, part of the wire can carry the breaker’s full rating plus the inverter’s output without anything tripping. At 1,200 W the inverter adds 10 A at 120 V. That’s why we recommend a dedicated circuit for any plug-in system, even where the law doesn’t require one.

Continuous output. Code treats inverter output as continuous and sizes the circuit at 125% of it (NEC 705.28): 1,200 W is 10 A, times 1.25 is 12.5 A, which fits a 15 A circuit. Anything over 1,440 W needs a 20 A circuit.

Outdoors. Outdoor receptacles need GFCI protection (NEC 210.8) and an in-use weatherproof cover (NEC 406.9).

AC, not panel watts. These laws limit what the inverter puts out, not what the panels are rated for. You can put more panel on a small inverter; it trims the brightest hours and fills out the rest of the day. The Designer models that trimming hour by hour.

Design your systemSee Virginia on the map

Questions

When is plug-in solar legal in Virginia?

January 1, 2027, when Code of Virginia § 56-596.8 takes effect.

Do I have to notify the utility in Virginia?

Yes, before installing, on the State Corporation Commission’s form. The utility has 15 days to flag problems; no reply means you can install.

Can my landlord ban plug-in solar in Virginia?

Not if the landlord owns more than four rental units, though they can set reasonable size and placement rules. Smaller landlords aren’t covered.

Sources

Bill text read September 29, 2026; law checked October 13, 2026 by Casey Schuyler, NABCEP PV Associate and O&M Associate Technician, Sun Safe LLC. Information for planning, not legal advice. Laws change; verify against the bill and your local authority having jurisdiction. Sun Safe’s position: installations should be code-compliant, and a practicing electrician is recommended.