Sun Safe LLC

Plug-In Solar in California

The law, and what it means for your design.

Plug-in solar by state › California

Signed, takes effect January 1, 2027

Law checked Oct 13, 2026 against SB 868, Chapter 985 · Last change: 2030 sale rule states all three conditions; notification wording · Change log

Governor Newsom signed SB 868 on September 30, 2026, the last day he could act. From January 1, 2027, a certified plug-in system up to 1,200 W per home skips the utility’s interconnection process entirely. The catch for buyers is the certification: the law asks for a complete plug-in system certified by UL or another testing lab, and those products are only expected in 2027.

What you can build today

No plug-in path yet. From January 1, 2027 the law requires a certified complete plug-in system, and none is certified (October 2026).

Always an option: a permitted, hardwired system under NEC 690 and 705 with your utility’s approval, or an off-grid power station that never connects to house wiring. UL Solutions notes the 2026 NEC “does not recognize the use of plug-in photovoltaic (PIPV) modules”; NFPA expects them in the 2029 edition (source). Where a law requires the NEC and gives no size waiver, the inspector decides. Sun Safe’s reading, not legal advice.

Limit
1,200 W AC per dwelling
Law
SB 868
Signed
September 30, 2026
Effective
January 1, 2027

What the law says

Size limit1,200 W maximum aggregated AC output
How it’s measuredPer dwelling (§ 8530(c)(1)). Our reading: each apartment is a dwelling with its own 1,200 W.
ConnectionConnects to and disconnects from the building’s wiring through a receptacle. Must be intended to offset the home’s own use.
ListingCertified as a plug-in photovoltaic system by UL or an equivalent nationally recognized testing lab. Must meet the current NEC and the California Electrical Code (Title 24, Part 3).
Outage protectionA certified feature that isolates the device from the building’s wiring so it can’t backfeed the grid during an outage.
Utility noticeThe utility may require a simple online notification of the address, make, model and size. It can’t require approval (§ 8531(c)).
Utility approval and feesExempt from all interconnection requirements: state law, the Public Utilities Commission, investor-owned and publicly owned utility rules alike. No approval, no fee related to the device or the power it feeds in, no extra equipment.
SunsetThe interconnection exemption ends January 1, 2030 unless the Legislature renews it.
From 2030A plug-in device can’t be sold unless it meets all three conditions: the electrical code, plug-in PV system certification and certified outage protection (§ 8532).
If a condition is missedThe device doesn’t get the exemptions (§ 8531(d)).
Not in the lawElectricians, permits, net metering, landlords and HOAs aren’t mentioned.

In the law’s words

Short excerpts from SB 868, Chapter 985, Statutes of 2026 (Pub. Util. Code §§ 8530–8532), quoted as written and checked word for word against the official text on October 13, 2026; each with what it means for a plug-in design.

11 excerpts with what each means

What it means for your design

Designs that fit, and one that doesn’t

FitsA complete plug-in system certified by UL or another testing lab, up to 1,200 W AC, with the utility notified online if it asks.
FitsIn an apartment building, a certified 900 W system in each of several units (our reading: each unit is a dwelling).
Doesn’t fitA microinverter certified on its own, paired with any panels: the law asks for the whole system to be certified.
Doesn’t fitTwo 900 VA systems in one home (1,800 W).

The engineering behind it

Why the circuit matters as much as the law, in four short points.

Circuit current, continuous output, outdoor outlets, AC vs panel watts

Why the circuit matters. A plug-in inverter pushes current into a branch circuit from the outlet end. The breaker in your panel only sees the current coming from the panel, not what the inverter adds. With other loads on the same circuit, part of the wire can carry the breaker’s full rating plus the inverter’s output without anything tripping. At 1,200 W the inverter adds 10 A at 120 V. That’s why we recommend a dedicated circuit for any plug-in system, even where the law doesn’t require one.

Continuous output. Code treats inverter output as continuous and sizes the circuit at 125% of it (NEC 705.28): 1,200 W is 10 A, times 1.25 is 12.5 A, which fits a 15 A circuit. Anything over 1,440 W needs a 20 A circuit.

Outdoors. Outdoor receptacles need GFCI protection (NEC 210.8) and an in-use weatherproof cover (NEC 406.9).

AC, not panel watts. These laws limit what the inverter puts out, not what the panels are rated for. You can put more panel on a small inverter; it trims the brightest hours and fills out the rest of the day. The Designer models that trimming hour by hour.

Design your systemSee California on the map

Questions

Is plug-in solar legal in California?

Yes, from January 1, 2027. Governor Newsom signed SB 868 on September 30, 2026.

How big can plug-in solar be in California?

Up to 1,200 W of AC output per dwelling.

Do I need to tell my utility about plug-in solar in California?

Your utility may ask for a simple online notification with the address, make, model and size. It can’t require approval or charge a fee.

What certification does California require for plug-in solar?

Certification as a plug-in photovoltaic system by UL or an equivalent nationally recognized testing laboratory, plus compliance with the NEC and the California Electrical Code.

Does California’s plug-in solar law expire?

The interconnection exemption ends January 1, 2030 unless the Legislature extends it. From that date, a device can’t be sold unless it meets the electrical code, holds plug-in PV system certification and has certified outage protection.

Sources

Bill text read September 29, 2026; law checked October 13, 2026 by Casey Schuyler, NABCEP PV Associate and O&M Associate Technician, Sun Safe LLC. Information for planning, not legal advice. Laws change; verify against the bill and your local authority having jurisdiction. Sun Safe’s position: installations should be code-compliant, and a practicing electrician is recommended.