Sun Safe LLC

Plug-In Solar in New York

The law, and what it means for your design.

Plug-in solar by state › New York

Passed, not yet law

Law checked Oct 13, 2026 against A 9111-C as passed (not law) · Last change: status, listing, notice form, outage and liability rows updated · Change log

New York’s SUNNY Act passed both chambers on May 28, 2026. The legislature’s record shows no delivery to Governor Hochul, signature or veto as of October 12, 2026. Under current utility rules, a plug-in system in New York needs the utility’s interconnection approval.

What you can build today

Not law. The utility’s interconnection rules apply. If signed, it requires a complete listed system, and none is certified (October 2026).

Always an option: a permitted, hardwired system under NEC 690 and 705 with your utility’s approval, or an off-grid power station that never connects to house wiring. UL Solutions notes the 2026 NEC “does not recognize the use of plug-in photovoltaic (PIPV) modules”; NFPA expects them in the 2029 edition (source). Where a law requires the NEC and gives no size waiver, the inspector decides. Sun Safe’s reading, not legal advice.

Limit
1,200 W AC inverter nameplate, if signed
Law
SUNNY Act
Signed
Not yet. Passed both chambers May 28, 2026
Effective
90 days after it becomes law

What the law says

Size limit (if signed)1,200 W aggregate continuous AC inverter nameplate output to the grid.
ListingListed or certified by an NRTL as a complete plug-in PV system (§ 66-j(1)(j)). The passed version doesn’t name UL 3700.
Outage protectionMust keep the system from energizing the building or grid during an outage.
CodesInstalled to the state fire prevention and building code and the manufacturer’s instructions.
Utility noticeWithin 30 days after installing, on a simple form on the utility’s website: name and contact information, service address and account number, make and model, rated size.
Utility approval and feesNo approval, fees (including for sending power back) or extra equipment. Exempt from interconnection unless you opt in.
Power sent to the gridUnpaid unless you sign up for net metering or another compensation agreement.
Utility liabilityThe utility isn’t liable for damage or injury from the device, except where it would otherwise be liable (§ 66-j(7)).
Which utilitiesWritten for electric corporations; LIPA and municipal utilities aren’t named.
TodayNot law. Under current utility rules, connecting needs utility permission.

In the law’s words

Short excerpts from SUNNY Act, A 9111-C / S 8512-C as passed May 28, 2026 (not law); new text, printed in capitals in the bill, shown in normal case, quoted as written and checked word for word against the official text on October 13, 2026; each with what it means for a plug-in design.

11 excerpts with what each means

What it means for your design

The engineering behind it

Why the circuit matters as much as the law, in four short points.

Circuit current, continuous output, outdoor outlets, AC vs panel watts

Why the circuit matters. A plug-in inverter pushes current into a branch circuit from the outlet end. The breaker in your panel only sees the current coming from the panel, not what the inverter adds. With other loads on the same circuit, part of the wire can carry the breaker’s full rating plus the inverter’s output without anything tripping. At 1,200 W the inverter adds 10 A at 120 V. That’s why we recommend a dedicated circuit for any plug-in system, even where the law doesn’t require one.

Continuous output. Code treats inverter output as continuous and sizes the circuit at 125% of it (NEC 705.28): 1,200 W is 10 A, times 1.25 is 12.5 A, which fits a 15 A circuit. Anything over 1,440 W needs a 20 A circuit.

Outdoors. Outdoor receptacles need GFCI protection (NEC 210.8) and an in-use weatherproof cover (NEC 406.9).

AC, not panel watts. These laws limit what the inverter puts out, not what the panels are rated for. You can put more panel on a small inverter; it trims the brightest hours and fills out the rest of the day. The Designer models that trimming hour by hour.

Design your systemSee New York on the map

Questions

Is plug-in solar legal in New York?

Not yet. The SUNNY Act passed both chambers on May 28, 2026; the legislature’s record shows no delivery, signature or veto as of October 12, 2026. It would take effect 90 days after becoming law.

How big could plug-in solar be in New York?

Up to 1,200 W of aggregate AC inverter nameplate output, if the SUNNY Act becomes law.

Sources

Bill text read September 29, 2026; law checked October 13, 2026 by Casey Schuyler, NABCEP PV Associate and O&M Associate Technician, Sun Safe LLC. Information for planning, not legal advice. Laws change; verify against the bill and your local authority having jurisdiction. Sun Safe’s position: installations should be code-compliant, and a practicing electrician is recommended.