Sun Safe

Sun Safe LLC • R&D Documents

Patent pending • verification and reference documents

Verify Sun Safe

STATE RECORD

Sun Safe LLC — Vermont LLC

  • Record No. 489840
  • Filing No. 20260414278634
  • Filed and effective Apr 12, 2026
  • Member: Casey C. Schuyler

Verify: Vermont Secretary of State business search → search “Sun Safe LLC”.

PATENT PENDING

U.S. Provisional Application 64/026,462

  • Filed Apr 2, 2026
  • Inventor and applicant: Casey Cole Schuyler
  • Foreign filing license granted Jun 5, 2026
  • Micro entity

Provisional applications aren’t published or searchable at the USPTO. The filing receipt is below; confirmation through patent counsel on request.

CREDENTIALS

Casey Schuyler

Founder, Sun Safe LLC · LinkedIn

  • NABCEP PV Associate: PVA-072326-018525
  • NABCEP O&M Associate Technician: OMAT-072426-013577
  • Ran and recorded all seven Phase 1 trials (Aug 29 and Oct 22, 2026) · Trial records

Verify: NABCEP Professional Directory → search by name. Certificates: Contact page.

Independent witness

WITNESS · OCT 22, 2026

Mark Foote

EMS Coordinator / Fire Captain, Killington Fire & Rescue · LinkedIn

Witnessed the Oct 22, 2026 Phase 1 field testing on site, entered readings and signed each trial log:

Background, The Mountain Times, May 24, 2023: “Killington Fire and Rescue hires two” · “Mark Foote becomes Killington’s first full-time paid firefighter”.

Documents

USPTO provisional filing receipt (page 1 of 3)

Application 64/026,462, filed Apr 2, 2026, mailed Jun 8, 2026.

JPEG · 246 KB

Open

Vermont Articles of Organization — Sun Safe LLC

Filed Apr 12, 2026 (11 V.S.A. § 4023), record 489840.

PDF · 249 KB

Open

Irradiance threshold justification (OD 2.3 / 2.5)

Beer-Lambert transmission vs. 7 W/m² and 125 mA across documented peak irradiance. Rev. B, Oct 21, 2026: test-module Isc 8.71 A (nameplate), cited sources, 125 mA as a measurement-noise gate.

PDF · 89 KB

Open

The Lineman’s Gap / The PV Gap

How the lineman’s rubber gloves went from a practical field fix to a standard every maker builds to, and why the new light-blocking products for PV, each tested its own way, now need the same. Updated Oct 24, 2026, with Phase 1 results, design levels and 15 linked sources.

PDF · 438 KB · 3 pages

Open

Phase 1 trial records (PDF, one per trial)

The completed log for each published trial: Side 1 raw data, Side 2 results, signatures and photo record, as generated by the v29 log. Open to view or print; Download to save. Current is the BT270 clamp reading with the sheet on.

Trial 1 · PASSAug 29, 2026 · 7 mA · PDF 92 KB · 2 pagesOpenDownload
Trial 2 · PASSAug 29, 2026 · 8 mA · PDF 92 KB · 2 pagesOpenDownload
Trial 3 · PASSAug 29, 2026 · 2 mA · PDF 92 KB · 2 pagesOpenDownload
Trial 004 · PASSOct 22, 2026 · witnessed · 7 mA · PDF 436 KB · 3 pagesOpenDownload
Trial 005 · PASSOct 22, 2026 · witnessed · 11 mA · PDF 678 KB · 3 pagesOpenDownload
Trial 006 · PASSOct 22, 2026 · witnessed · 8 mA · PDF 639 KB · 3 pagesOpenDownload
Trial 007 · PASSOct 22, 2026 · witnessed · 4 mA · PDF 664 KB · 3 pagesOpenDownload

Phase 1 field test plan, V18

Protocol, instruments, trial sequence by log box (with the photo record), Side 2 analysis, threshold derivations, results for all seven trials, recorded deviations, OD from both meter pairs, scaling to any monofacial module, levels met and sourced references. Monofacial modules only. V18, Oct 24, 2026.

PDF · 453 KB · 17 pages

Open

Reference study

Firefighter Safety and Photovoltaic Installations Research Project

Backstrom & Dini, Underwriters Laboratories, Nov 29, 2011 (DHS Fire Prevention and Safety grant).

§9.1 cover, 1 layerVocIscUL’s call
4 mil black plastic33 V0 ASafe
Blue all-purpose tarp126 V2.1 AElectrocution
Canvas salvage tarp3.2 V0 ASafe
Red vinyl salvage tarp124 V1.8 AElectrocution
Full sun (4 × 230 W)148 V8.1 A

Full report (FSRI, PDF) · Project page

Shock reference: current and voltage thresholds

DC current through the body, as UL 2011 classifies its results (PDF p. 23). A source cannot push more current through a person than its short-circuit current.

Safe0–2 mA
Below perception
Perception2.1–40 mA
Felt; startle can cause a fall
Lock On40.1–240 mA
Muscle lock-on, breathing can stop
Electrocution> 240 mA
Heart can stop
Sun Safe Phase 1
2–11 mA
40 mA
NFPA 70E
UL tarps 1.8–2.1 A
full sun 8.1 A
Voltage / current thresholdValueSource
DC shock hazard (PV)100 V and 40 mANFPA 70E 2027 First Draft, FR-102, proposed 390.2(2) (draft text)
Rapid shutdown, outside the array boundary≤ 30 V within 30 sNEC 2017–2023 690.12(B)(1); 30 V chosen as touch-safe in wet conditions per (Brooks & Rogers, IAEI 2015)
Rapid shutdown, inside the array boundary≤ 80 V within 30 s, or a listed hazard control systemNEC 2017–2023 690.12(B)(2)
Sun Safe Stage 1 (S1) gate< 125 mAMeasurement-noise gate (meter floor) — not a shock limit

Values are for reference only and do not replace an NFPA 70E shock risk assessment or PPE.

Field log

Phase 1 field trial log (v29)

The working log used to record Phase 1 test data on site, with automatic Side 2 results. For Sun Safe use; the published trials are in the trial records above.

Open